Limehouse Lock

Intermarine has just completed the two Limehouse Lock mooring facilities in East London. The design team and site crew had to deal with very exposed and difficult site conditions, including 7 metres tide drops and regular wash from fast travelling heavy crafts. This challenging project has been successfully achieved using Intermarine specially designed heavy duty tubular pontoons. Their team has shown again their efficiency to deal with any difficult and complex site requirements.