Orsted ECH Pontoon
Put something here
Location: East Coast Hub (ECH) for Orsted wind farm vessels-Royal Docks, Grimsby, Lincolnshire
Project Description: Design, Construction and installation of a 64m long by 6m wide mooring pontoon suitable for Swath type wind farm vessels up to 120T. The pontoon consists of a very heavy-duty modular steel frames, bolted together to create a single semi-rigid pontoon and reinforced with 400mm deep side channels. The works included a design and installation of; 12mlong by 1.5m wide Access Bridge and 30m long by 1016mm diameter mooring piles. The pontoon includes an array of services and a bespoke boarding ramp for push-on access to the work boats, designed, manufactured and installed by Intermarine.
Client Reference: name??
“The cooperation with Intermarine has been very successful. Scott Gathery has an innovative mindset, andalways looks for opportunities instead of limitations. Orstedhas been very satisfied with the overall workand will like do business with Intermarine in the future”

Work Boat Pontoons