Seawork
Heavy duty galvanised steel pontoons
Each project is custom designed to suit the site and the requirements.
All Seawork pontoons are individually designed around the following basic principles
Intermarine has designed and built a wide variety of Landing Stages to cater for vessels up to 250 tonnes. Typical examples are:
Intermarine can undertake these types of schemes as Turnkey projects covering design, pontoons, access bridges and piles or moorings.
Access bridges up to 40m long designed for full pedestrian loading can be supplied for Seawork projects.
Seawork pontoon on trestle arm to prevent the linear pontoon from resting on the seabed.
Seawork pontoon supported on trestle arm to prevent the pontoons from resting on the seabed, bespoke design to adapt with embarkation height of the Reaper historical boat height regardless the sea level.
Seawork pontoon fixed by wall column guides accessible by a quay bridge.